Skip to content
L
u
n
a
r
T
i
d
e
N
i
g
e
r
i
a
L
i
m
i
t
e
d
Loading
Lunar Tide Nigeria Limited
Dynamic 0il And Gas Operations
Home
About Us
Projects
Quality Assurance Policy
Health & Safety Policy
Management
Managing Director – Mgudo Desmond
Accounts Officer – Agorua Christopher
Project Manager – Kennth Nwabughiogu Augustine
Site Engineer – Onyejiawa Paulson Chuks
Products And Services
Agriculture
Pump Maintenance and Inspection
Heavy Equipment Leasing
Non-Destructive Inspection Services
Equipment Supply
Supplies
Heavy Equipment Leasing
Tubular (OCTG) Inspection and catering to the unique requirements of the oil and gas industry
Non-Destructive Inspection Services
Pump Maintenance and Inspection
Pump Laser Alignment
Ultrasonic Pump Efficiency Test
Contact
Search for:
Lunar Tide Nigeria Limited
Dynamic 0il And Gas Operations
Search for:
Home
About Us
Projects
Quality Assurance Policy
Health & Safety Policy
Management
Managing Director – Mgudo Desmond
Accounts Officer – Agorua Christopher
Project Manager – Kennth Nwabughiogu Augustine
Site Engineer – Onyejiawa Paulson Chuks
Products And Services
Agriculture
Pump Maintenance and Inspection
Heavy Equipment Leasing
Non-Destructive Inspection Services
Equipment Supply
Supplies
Heavy Equipment Leasing
Tubular (OCTG) Inspection and catering to the unique requirements of the oil and gas industry
Non-Destructive Inspection Services
Pump Maintenance and Inspection
Pump Laser Alignment
Ultrasonic Pump Efficiency Test
Contact
Projects
Home
Projects
Reinforcement of the Shutters of the 15m ×8.5m 2nd Double Culvert with Pipe support @ OFS Sterling Exploration oil and gas
High pressure crude oil Pump maintenance Installation, overhauling
High pressure crude oil Pump maintenance Installation, overhauling
High pressure crude oil Pump maintenance Installation, overhauling
High pressure crude oil Pump maintenance Installation, overhauling
Reinforcement of the Shutters of the 15m ×8.5m 2nd Double Culvert with Pipe support @ OFS Sterling Exploration oil and gas
Reinforcement of the Shutters of the 15m ×8.5m 2nd Double Culvert with Pipe support @ OFS Sterling Exploration oil and gas.
×
Talk to us!!!